No Drill Cordless Aluminum Mini Blinds S-Curve Blinds Darkening  30
Go to next photo Go to previous photo

No Drill Cordless Aluminum Mini Blinds S-Curve Blinds Darkening 30" W x 64" H

lazblinds

30.00 $
Description
A standard 3/8 inch deduction is made to the upper rail width for a proper inside mount fit. The actual blind size will be 29 5/8 W x 64 H, perfect for window 30 W x 64 H. The unique spring rod can extend 1 inch in total, allow the blind to fit for window size W 29.7-30.6 X H 64. No Drill Blinds: LazBlinds patented technology No Tools-No Drill system allow it no need to drill any holes on your window frame. Perfect for Renter, Landlord, and Home Buyer. Easy to Install in 30 seconds without screws or brackets. Fit All Kinds of Walls, like woodiness metope, tile marble, concrete wall and rough tile. Privacy Blinds for Windows: Premium dense S-curve slats with invisble hole design can completely keep out the sunlight and uv ray, offering a real dark environment. At the same time it is possible to use the twisting wand to switch between light filtering or room darkening. Perfect for living room, family room, bedroom, bathroom. Cordless Blinds for Windows
Details

                                                        
video
Delivery in 24/48 h

SHIPPINGS

Free shipping in Spanish mainland, Balearic Islands and Portugal.

For other countries the shipping cost will be paid by the client.

DELIVERY TIME (as of delivery)

Spanish mainland, Balearic Islands and Portugal: 1-2 working days.

Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.

Free returns

The return period is 14 calendar days from the receipt of the order.

Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.