Huge Lot: 200 Vintage Woodworking Project Plans & Measured Drawings Binder
Verns Pattwrn Shop
comprehensive collection of vintage woodworking designs from the Woodworking Pattern Club (Vern's Pattern Shop, Albany, OR). This 3-ring binder contains approximately 200 unique projects, ranging from decorative home items to large-scale heirloom furniture. Professional Technical Format: These are Detailed Measured Drawings and dimensional schematics. They are designed for the builder who wants exact specifications without the fluff of a how-to manual. You will find some patterns with grid scale patterns , complete cut list, exploded assembly pieces in this binder. Featured projects Gun Storage: Multiple designs for 5, 6, 9, and 12-gun vertical and horizontal cabinets. Heirloom Furniture: Grandmother Clock (Series 1), Colonial Dry Sinks, Hutches, and Desks. Kitchen & Storage: 13+ Spice Cabinet designs (5 to 12 drawers), Apothecary Chests, and Benches. Outdoor Living: Adirondack-style chairs, Trestle Picnic Tables, and Garden Swings. IMPORTANT NOTE TO BUYERS: These are high-quality technical drawings and dimensional schematics. They provide the numbers and assembly views needed to build. They do NOT include written step-by-step how-to text or full-size fold-out tracing sheets.
SHIPPINGS
Free shipping in Spanish mainland, Balearic Islands and Portugal.
For other countries the shipping cost will be paid by the client.
DELIVERY TIME (as of delivery)
Spanish mainland, Balearic Islands and Portugal: 1-2 working days.
Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.
The return period is 14 calendar days from the receipt of the order.
Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.