SL Steam Locomotive - SB3 C58 Shibushi Line - Ensure adequate water supply during summer
1973 C58 112 Shibushi Line - Proper Water Refilling in Summer
[C58 112] History
1939-02: Newly built by Kisha Seizo Osaka, assigned to Nagoya Bureau, stationed at Inazawa Ward.
1939-11: Inazawa Ward → Kanazawa Ward → Inazawa Ward → Nogata Ward → Kagoshima Ward → Bungomori Ward.
1942-11: Bungomori Ward → Tajimi Ward → Bungomori Ward → Oita Ward.
1958-04: Pulled the Imperial train for the 9th National Tree Planting Festival in Oita Prefecture, attended by Their Majesties.
1960-03: Oita Ward → Oita Driving Center.
1960-10: Pulled the Imperial train for the 15th National Sports Festival in Kumamoto Prefecture, attended by Their Majesties.
1962-02: Installed a Kōkura (Kōkura style) deflector at Kōkura Factory.
1966-10: Reserve engine for the Imperial train for the 21st National Sports Festival in Oita Prefecture, attended by Their Majesties.
1972-06: Oita Driving Center → Shibushi Ward.
1974-12: Designated for Class 1 reserve, Shibushi Ward.
1975-02: Scrapped (Shibushi Ward). Total mileage: 2,115,042 km.
1975-03: Free loan agreement between the Kagoshima Railway Bureau Director and the Mayor of Shibushi Town.
2016-04: Continues to be preserved at Shibushi Railway Memorial Park with a roof, fence, and platform, receiving regular maintenance.
https://www.sibusi-k-t.jp/wp-content/uploads/2021/09/202.jpg
A4 size photo, framed.
Height: 23.0 cm, Width: 31.5 cm. Wall-mounted / Tabletop type.
Self-taken work.
#Photo
#Steam Locomotive
#SL
#C58 112
#Shibushi Line
CategoryArt Of ArtConditionNew/unusedShippingIncluded in price (by seller)FromKanagawa
SHIPPINGS
Free shipping in Spanish mainland, Balearic Islands and Portugal.
For other countries the shipping cost will be paid by the client.
DELIVERY TIME (as of delivery)
Spanish mainland, Balearic Islands and Portugal: 1-2 working days.
Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.
The return period is 14 calendar days from the receipt of the order.
Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.